1980

  • A new LPG gas plant is commissioned in Albany.

  • Rapeseed oil is tested at Hopetoun Power Station as an alternative to diesel fuel.

Rapeseed oil is tested as an alternative for diesel fuel.

  • The second 330kV transmission line from Muja to Perth is completed.

Transmission lines from Muja to Perth are completed.

  • On 30 September, the SEC of WA signs a contract for the 20-year supply of 414 terajoules of natural gas per day from the North West Shelf.

  • Work commences on the North Rankin A production platform, a submarine trunkline to shore and the domestic gas processing plant.
    Google Earth Link Google Earth - North West Shelf

North Rankin A gas platform under construction.

  • The first 200MW, Stage C Muja generator is in service.

Muja stage C 200MW turbo alternator being installed.

  • The 22kV MAN and 50kV DAF wind turbines are commissioned on Rottnest Island in December.

50KV DAF wind turbine at the Rottnest Island test site. 22KV MAN wind turbine at the Rottnest Island test site.

  • In October, the North West Shelf Gas Project is launched.

  • On 19 December, the second 132kV transmission line to Geraldton is energised.

132KV transmission line to Geraldton is energised.


1981

  • The design stage of the 220 kV transmission link from Muja Power Station to Kalgoorlie commences.

  • In June, it is announced that the East Perth Power Station will close as soon as the existing coal stocks at the power station are exhausted.

  • In July, construction commences on the Meekatharra solar thermal power station.
    Google Earth Link Google Earth - Meekatharra

Model of the Meekatharra solar thermal power station.

  • Planning commences for a proposed 1,400 MW power station to be sited adjacent to the existing Bunbury Power Station.

Artist impression of the new Bunbury Power Station.


1982

  • The Meekatharra solar thermal power station is completed.

Meekathara Solar Thermal Power Station is completed.

Muja Stage C is completed.

East Perth Power Station is closed.


1983

  • In January, a 50kW Nordtank wind turbine is erected on Rottnest Island.

  • In February, work commences on the northern section of the Dampier to Wagerup Natural Gas Pipeline.

Work on the northern section of the Dampier to Wagerup Natural Gas Pipeline.

  • Work commences on the centre section in March.

The center section of the Dampier line to Wagerup natural gas pipeline being constructed.

  • In April, work commences on the southern section.

The southern section of the natural gas pipeline is installed.

  • The new Onslow Power Station is opened.

Onslow Power Station.

  • The site for the construction of the proposed new South West Power Station changes from Bunbury to the Collie region.

  • The first stage of the Pilbara integrated power system is completed with the commissioning of the 132kV link Cape Lambert to Karratha.

1984

  • On 27 January, the mainline construction phase of the Dampier to Wagerup Natural Gas Pipeline is completed.

The Dampier to Wagerup natural gas pipeline line is completed and gas turned on.

  • The SEC of WA introduces an Energy Education Program for Western Australian schools.

  • A Western Australian-built Westwind experimental 60kW wind turbine is installed in South Fremantle.

Westwind wind turbine at the South Fremantle test site.

  • On 8 August, the 665km Muja Power Station to Eastern Goldfields 220kV transmission line is energised.

  • North West Shelf natural gas is supplied to Perth Metro customers.On 16 August, North West Shelf natural gas is supplied to Perth metropolitan customers.







  • In October, Nos. 3, 4, 5 and 6 generating units at the Kwinana Power Station are converted to natural gas.

  • Pipeline extensions from Wagerup to Bunbury is completed.In November, the pipeline extension from Wagerup to Bunbury is completed.









1985

  • The SEC of WA celebrates its tenth anniversary on 1 July.

  • The rural electrification scheme is completed with 99% of Western Australian farms having access to the SEC of WA for their power supplies.

99% of Farms have access to SEC power supplies.

  • The SEC of WA's 500,00th customer is connected.

  • The second 30kW Aeroman wind turbine is installed at the South Fremantle test site.

The 22KV Aeroman wind turbine is installed at the South Fremantle test site. The turbine is now located at World of Energy.

  • The Meekatharra solar thermal power plant is shut down.

The Meekathara Solar Thermal Power plant is shut down.

  • Stages C and D of Muja Power Station are officially opened.

Stages C and D of Muja. Muja power station grows with demand.

  • In September, North West Shelf gas is supplied to Geraldton customers.

  • The last gas holder at East Perth Gas Works is demolished.

  • On 27 September, the South Fremantle Power Station closes after 34 years' service.
    Google Earth Link Google Earth - South Fremantle Power Station

South Fremantle Power Station closes down.

  • The interconnected grid is now supplied from Bunbury, Kwinana and Muja Power Stations.

  • In October, the second stage of the Pilbara integrated power system is completed with the 220kV transmission link between Cape Lambert and Port Hedland.

Stage 2 of the Pilbara integrated power system is completed.

 

 

internal site link Next Section >> 1986 - 1993.

^ back to top ^

WA Timeline
1849 - 1886  
1888 - 1899  
1900 - 1912  
1913 - 1924  
1926 - 1936  
1937 - 1947  
1948 - 1957  
1958 - 1966  
1967 - 1975  
1976 - 1979  
1980 - 1985  
1986 - 1993  
1994 - 1998  
1999 - 2006  
 

 

© 2006, 2007, Western Power (ABN: 18 540 492 861).
All Rights Reserved. Your use of this website constitutes acceptance of the
Western Power Privacy Policy and Terms and Conditions.

Last Updated: 27/02/2007